    A Ford-Based Branch-and-Bound with Minimum Cut Lower Bounds for the Resource-constrained Project Scheduling Problem

    Hawa Kaba Bah, Amadou Oury Balde, Ibrahima Bah, Aboubakary Diakhaby*

    Issue: Volume 11, Issue 4, August 2026
    Pages: 64-70
    Received: 4 June 2026
    Accepted: 13 June 2026
    Published: 30 July 2026
    Downloads:
    Views:
    Abstract: The Resource-Constrained Project Scheduling Problem (RCPSP) is a classical NP-hard optimization problem with numerous real-world applications in construction, manufacturing, software development, and logistics. The Ford algorithm efficiently computes earliest and latest start times under precedence constraints in linear time. However, its direct ex... Show More
  • Research Article

    Comparing FDM, FVM, and FEM for Coupled Flow-Transport in a Guinean Bauxite Mining Aquifer

    Michel Faya Kamano, Mouhamadou Nassirou Diallo, Mariama Ndiaye, Aboubakary Dinakhaby*

    Issue: Volume 11, Issue 4, August 2026
    Pages: 71-77
    Received: 31 May 2026
    Accepted: 10 June 2026
    Published: 11 August 2026
    DOI: 10.11648/j.mcs.20261104.12
    Downloads:
    Views:
    Abstract: Bauxite mining in Guinea, particularly in the Boke region, generates significant risks of groundwater contamination by metals and acidification. This paper develops a deterministic coupled groundwater flow and reactive solute transport model applied to the N'Dangara and Boundou Wande bauxite plateaus (CBG concession, Sangaredi, Guinea). The steady-... Show More